Thanks to Franklin Marine, Bendigo 1 is currently at Franklin Marina under going some much needed maintenance.

Maintenance Includes:

  • Relocation of main battery switches
  • New power and earth connection leads
  • Upgrade Radar, GPS, Navigation Card
  • Depth sounder fitted to our A Series Raymarine chart plotter at the helm
  • Plumbing on motor upgraded
  • AIS fitted (Boat Position Tracking)
  • Refitting of canopy and new fixing system
  • New canopy cover
  • Bilge pump hoses upgraded
  • Stainless steel wire being replaced
  • New berthing ropes
  • New connection for charging starter batteries
  • Fresh coat of paint on the back deck.
  • New gas bottle

VMR Kingborough would like to say a special thanks to Laurence and his team at Franklin Marine.

All Work is Proudly Been Done By…

FranklinMarineLogo

Projects

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>